Civil Construction of building and Desalination Plant at plant site village Thumdi, Kutch(Naliya).
 
Client
:
APG Cement Ltd.
Project Site : Thumdi, Kutch(Naliya).
Concrete Volume
:
25,000 Cu M
Status
:

Mobilization Started

 
 
 
 

Civil construction for 2 X 30 mega watts Coal-Based Thermal Power Project at Bainchua, Tangi, Cuttack, Orissa.

 
Client
:
Maa Durga Thermal Power Co. Ltd.
Project Site
:
Bainchua, Tangi, Cuttack, Orissa.
Concrete Volume
:
12000 Cu M
Status
:
Mobilization Started
 
 
 
Civil work for 1500 M.T. (2 Nos. Truck Loading Silos) and 4000 M.T. (1 No. Wagon Loading Silos) at West Port, Mundra
 
Client
:
Adani Limited
Project Site
:
West Port,
Mundra
State : Gujarat
Concrete Volume
:
3000 Cu M
Structural Steel
:
750 M.T
Status
:
20% Completed
 
 
Civil Works for Balance of Plant and Road Works at 2 X 60 MW Coal Based Power Plant at Cuttack, Orissa
 
Client
:
Thermax Instrumentation Ltd.
Project Site : Cuttack, Orissa
Concrete Volume
:
18,000 Cu M
Status
:

5% Completed

 
 
 
Civil works for OSBL and Cooling Tower for Butane Plant at Hazira
 
Client
:
Reliance Industries Limited
Project Site : Hazira,
Surat,
State : Gujarat
Concrete Volume
:
8500 Cu M
Reinforcement Steel : 800 M. T
Status
:
75% Completed
 
 
 
 
Civil work for Blade & Tower manufacture unit at Bawla, Ahmedabad, Gujarat
 
Client
:
InoX Wind Ltd.
Project Site
:
Bawla
Dist : Ahmedabad
State : Gujarat
Concrete Volume
:
5000 Cu M
Structural Steel
:
1500 M.T
Status
:
95% completed
 
 
Civil works of Cooling Tower, CHP, TG-2 and DM Plant for 2 X 600 MW Power Plant Project
 
Client
:
Essar Projects India Ltd.
Project Site : Mahan Thermal Power Project,
Village Bandhora, Post Karsuvalal,
Tehsil Waidhan, Dist :Singrauli
State : M P
Concrete Volume
:
27,000 Cu M
Reinforcement Steel : 3987 M. T
Status
:
75% completed
 
 
 
 
Civil work of Ash Handling system for 4000 MW Ultra Mega Power Project at Mundra, Kutch, Gujarat.
 
Client
:
The Indure Pvt. Ltd.
Project Site   Mundra
Dist : Kutch
State : Gujarat
Concrete Volume
:
16,000 Cu M
Status
:
90% Completed
 
 
Civil Package for Green Anode Plant, Vedanta Jharsuguda
 
Client
:
M/s Mcnally Bharat Engineering Company Ltd, Kolkatta
Project Site
:
Jharsuguda, Orissa
Concrete Volume
:
22,000 Cu M
Status
:
Completed
 
   
 
 
 
Civil work of 50 MW Power Plant at Ras, Rajasthan
 
Client
:
M/S Cethar Vessels ltd. (Trichi, TM)
Project Site   Village : Ras
Dist : Pali
State : Rajasthan
Concrete Volume
:
8,500 Cu M
Status
:
98% Completed
 
 
Civil work of construction for 60 TPH at Beawar
 
Client
:
Shree Cement Ltd.
Project Site   Beawar
State : Rajasthan
Concrete Volume
:
8,000 Cu M
Status
:
Completed
 
 
 
 
Civil work of Waste Heat Recovery System (WHR) (Unit - III to Unit - VII).
 
Client
:
Shree Cement Ltd.
Project Site   Ras
Dist : Pali
State : Rajasthan
Concrete Volume
:
7,000 Cu M
Status
:
Completed
 
 
Civil work of Air Cooled Condenser (ACC)
 
Client
:
Shree Cement Ltd.
Project Site   Beawar
State : Rajasthan
Concrete Volume
:
3,000 Cu M
Status
:
Completed
 
 
 
 
Civil and Road Package of Carbon Black Plant and 26 MW power Plant:
 
Client
:
M/s Philipps Carbon Black Ltd, Kolkata.
Project Site   Mundra
Dist : Kutch
State : Gujarat
Concrete Volume
:
12,000 Cu M
Status
:
Completed
 
 
Civil Works Package V-Civil Works in BOP area/CHP area & Other mise. area in the plant
 
Client
:
Lanco Infratec Ltd.
Concrete Volume
:
8,000 Cu M
Status
:
Completed
 
 
 
 
Civil Construction Work of non plant building for cement project
 
Client
:
Nirma Ltd.
Project Site   Padhiarka
Taluka : Mahuva
Dist : Bhavnagar
State : Gujarat
     
Concrete Volume
:
8,000 Cu M
Status
:
25% Completed
 
 
Civil works for precast of pipe Racks of refinery area.
 
Client
:
Essar Construction (India) Ltd.
Project Site   EOL Refinery at Jamnagar
Dist : Khambhalia
State : Gujarat
Concrete Volume
:
30,000 Cu M
Status
:
Completed
 
 
Civil Package for Construction of 18 MW Power Plant and Additive Dump Hopper and other Civil Works of Cement Plant:
 
Client
:
M/s Shree Cements Ltd, Vill Ras, Pali. Rajisthan. 2007-2008
Status
:
Completed
 
Precasting Of Cooling Towers:
 
Client
:
Reliance Petrolium Ltd, Jamnagar. 2007-2008
Scope
:
Includes Design and Manufacturing of Required Formwork and casting of CT Wall Panels, Beams ,Slabs and Hot Water Channels including handling and transportation.
   
Concrete Volume
:
20,000 Cu M
Time Limit
:
7.5 Months
Average Manpower at pick
:
275 Nos.
   
Status
:
Completed
 
Precasting Of OSBL Pipe Rack.Portal Frames and Beams.
 
Client
:
JERP Project of Reliance Petroleum Ltd, Jamnagar : 2006
Scope
:
Formwork Design and Manufacture, Casting, Handling for Lifting from bed, Stacking, Curing and Loading/Transporting to the various erection contractors.
   
Concrete Volume
:
55000 cu mts.
Time Limit
:
9 months
Supervisory staff involvement
:
45 No.
   
Average Manpower
:
600 No.
Status
:
Completed
Precast work of OSBL pipe rack Portal Frames each (@ 62 MT total 1400 nos) and beams wt (@ 4 to10 MT each @ 12000 Nos)
Precast Manholes, Catch basins, Beams for Clean Fuels Plant, New CPP, and Aromatics etc. Precasting of Sills, Louvers and Mullions for PP Warehouse.
 
Construction OSBL Pipe Rack:
 
Client
:
JERP Project of Reliance Petroleum Ltd, Jamnagar. 2006-2007
Scope
:
Civil work of OSBL pipe rack.
Concrete Volume
:
20000 Cu M
Supervisory staff involvement
:
20 No.
   
Average Manpower
:

200 No.

Status
:
Completed
 
Manufacturing of Concrete Blocks:
 
Client
:
Reliance Industries Ltd, Jamnagar. 2006
Scope
:
Manufacturing of @ 40 Lac No Hollow blocks as per IS 2185 Grade B
Time Duration
:

7 Months

Status
:
Completed
 
Fabrication of Staircase tower, pontoon and walkway, Drilling Templates. Offshore fabrication works at Leighton barge.

Precasting RCC Sleepers for undersea pipeline support at JERP on top Barge.

Precast Work of NRP- D( New Riser Platform Deck),Fabrication of slop tanks.
 
Client
:
Leighton Contractors ( India ) Pvt Ltd. 2006-2007
Value
:
USD 1.5 Million
Status
:
Completed
 
Construction of HMU 3 Unit (Hydrogen Plant):
 
Client
:
Reliance Industries Ltd at Jamnagar. 2006
Scope
:
Civil work of HMU 3 (Hydrogen) Plant.
Concrete Volume
:
12000 Cu M
Supervisory staff involvement
:
12 No.
   
Average Manpower
:

150 No.

Status
:
Completed
 
Construction of DTA Plant:
 
Client
:
Reliance Industries Ltd, Jamnagar. 2006-2007
Scope
:
Complete Civil works of KHT/CNHT Unit,
V Rack, RTF Tanks, Sub Station, Equipment Foundations, UG/ISBL works.
Concrete Volume
:
43000 Cu M
Supervisory staff involvement
:
32 No.
   
Average Manpower
:

500 No.

Status
:
Completed
 
CPP Expansion Project: 2004 - 2005
 
Client
:
Reliance Refinery Complex. Reliance Industries Ltd. Jamnagar.
Scope
:
Civil works of 90 MW Captive Power Plant.
Construction of MRSS Building, Substations, Auxiliary Boiler foundations, GT Foundations, STG Building, Deareator Building, RCC Pipe racks, Duct Banks, Switchyard, Cooling Tower.GT Foundations, Aux Boiler, CCW & Fuel Pipe Racks, Tank Pads.
Concrete Volume
:
45000 Cu M
Time Duration
:
11 months
Techno-Commercial staff involvement
:
35 No.
   
Average Manpower
:

450 No.

Status
:
Completed
 
Construction of Sewer Line Network PAL III Area.
 
Client
:
RUIDP Jodhpur , Rajasthan 2003 -2004
Scope
:
With all Apparatuses, total length 24 Kms. Client RUIDP (Govt Of Rajisthan) Under ADB Loan.

Main Agency "Larsen & Toubro Ltd, ECC Construction Group "Ahmedabad Regional Office.
Status
:
Completed
 
DAIICT - Gandhinagar 2002 -2003
 
Client
:
Dhirubhai Ambani - Institute of Information And Communication Technology - Gandhinagar.
Scope
:
Computer Lab at DA-IICT (Gandhinagar), All civil & finishing.

Lecture Theater Complex 17000 Sq.Ft. with all Civil, Structural, and Electrification & finishing.
Status
:
Completed
 
Alstom - GEB Gandhinagar
  Retrofitting Of Machine Mill Foundations for ALSTOM Power at GEB Gandhinagar.
 
The Job Involved Demolition Of @ 400 Cu Mts Of RCC Foundations For The Mills, PA Fans, SA Fan, Critical Duct Supports and Miscellaneous Foundations and Constructing The Same @ 2500 Cu Mts As Per Design.
 
Owner
:
Gujarat Electricity Board. Gandhinagar Power Plant.
Main Agency
:
Alstom Projects (I) Ltd. C Segment. Baroda
 
Reliance Gokul Gram Yojana Project. 2002 -2006
 
The work is being carried out turnkey basis for Reliance Rural development Trust and each utility ( Panchayat Gruh,Community Hall,Aanganwadi, CC Road ) is completed and handed over in 95 days from start date.
 
Quality Construction has executed more than 250 buildings and utilities up to 2005.
 
Owner
:
Government Of Gujarat. Dept of Rural Development.
Main Agency
:
Reliance Rural Developmental Trust.Jamnagar.
A Trust Formed By
:
Reliance Industries Ltd.(Corporate NGO)
 
NC 14 -VT PUMP HOUSE & SUMP :2003 -2004
 
Location
:
Koba, Gandhinagar.
Owner
:
Gujarat Water Infrastructure Ltd. (GWIL)
Main Agency
:
Larsen & Toubro Ltd, ECC Construction Group, Ahmedabad Regional Office.
 
Civil Works Of Vertical Turbine Pump House (-6.5 mts to +18.5 mts) with 60 Lac Liters sump along with other site development works. Work Completed on Schedule.
 
T S1 EXPANSION, ANSALDO, NLC Neyveli (Tamilnadu). 2000-2001
 
Owner
:
Neyveli Lignite Corporation, neyveli, Distt Cuddalore, Tamil Nadu.
Main Agency
:
Simplex Concrete Piles (I) Ltd, New Delhi.
 
All finishing work excluding RCC at TS1 Expansion in TG building, Deareator bay and Bunker bay of heights 44Mts, 44Mts & 48Mts.Brickwork,Plastering, Flooring (Tiles and Granolithic), Mangalore Tiles.
 
 
 
ST - CMS, POWER PROJECT : 2000-2001
 
Main Agency
:
Simplex Concrete Piles (I) Ltd, New Delhi
 
Construction of Reservoir along with precast reservoir lining at ABB ST-CMS CCPP Uttangal Vridhachalam Tamil Nadu.
  Construction of cooling water reservoir along with 30000 sq mts of precast CC Lining manufacturing and installation.
 
NIRMA LTD:
 
Location
:
KALATALAV, BHAVNAGAR : 1998 -2002
Client
:
NIRMA LTD, NIRMA HOUSE, ASHRAM ROAD, AHMEDABAD.
Consultants
:
H&G, Mumbai for plant and SMPS, Ahmedabad for Non Plant and Salt Works.
  We carried out various works such as
 
Earth works in Bunds
Bund protection works and Canal Protection works @ 300000Sq Mts.
Minor Bridges and Culverts, Compound wall around 6 Kms., Bored piling, Drains.
 
Weigh Bridges , Pump house & Siphon aqua duct.
 
 
RELIANCE INFOCOMM LTD: 2000-2003
 
Owner
:
Reliance Infocomm Ltd. Ahmedabad.
 
Trenching & laying of OFC including all allied work from Bhavnagar to Dhasa 70Kms.
  Manufacture and Supply Of 11 Lacs Protection CC Tiles and Supply and Fixing Of 20000 Nos Route Markers.
  Construction of Intermediate stations buildings of Reliance Infocomm at Dhasa & Dhanduka
  Construction of BTS Towers in Bhavnagar Spread.
 
Precast Blocks/Pavers/Pipes & Other Precast Elements Manufacturing Facilities
 
Quality Technocast Pvt. Ltd., are involved in manufacturing of different types of Precast elements, such as Hollow & Solid blocks, Inter locking Paver blocks, Route markers, Man hole elements, Pool boxes, etc. using state of the fully & semi automatic static vibro hydraulic machines in Gujarat.
   